Frist Scaffolding inspection is required.
Equipment and materials used for scaffolding include:
Scaffold. Base Jack/U head Jack. Scaffolding plank/Steel Plank/Catwalk. Walkie talkie. Measuring tapes. Throw plate. Couplers. Rope. Metal bucket, sac or any other carrier eg crane/pulley systems. Cutting machine. Ladder.
To successfully erect a concrete ringlock scaffold, the scaffold pipes are placed in different ways to perform different functions. We have:
1. The transom which is the horizontal member upon which the steel plank are placed.
2. The diagonal brace which is the diagonal member that helps to hold and stiffen other members in the scaffold.
3. The ringlock scaffolding ledger which is the non-loading bearing horizontal members on each side of the scaffold.
4. The ringlock scaffolding standard which is the vertical member of the scaffold.
5. The guard rail which is the horizontal member that prevent scaffolders and scaffold users from falling.
