Answers To Common Questions About Frame Scaffolding
Place flat, root load experiment, material equipment - base - longitudinal sweeping pole - transverse sweeping pole - -Lift bar -Transverse sweep bar -Small horizontal bar -Large horizontal bar - scissor bracing - wall rods - scaffold boards - protective railings and safety nets. In the process of erecting the first layer of scaffolding, a diagonal support is set up along each frame frame in the vicinity, with two-way increases at the corners, to be removed only when the scaffolding in that part is firmly tied to the main structure of the wall pieces. When the scaffolding operation layer is two steps higher than the wall pieces, should adopt temporary stabilization methods, know that the wall pieces can only be removed after the end of erection. Double-row scaffolding is easy to set up the inner row of poles first, then the outer row of poles. Each row of uprights is easy to first stand two ends, and then stand one in the centre, after looking at each other, stand some of the uprights in the centre, double-row rack inside and outside the two uprights of the line to be straight with the wall. It is advisable to set up the outer row first and then the inner row when setting up the long pole.
Categories
New Blog
Copyright © 2024 AJ CENTURY GROUP. All Rights Reserved.
IPv6 network supported